AC 172-03 Application for IFP Flight Validation Service Provider (FVSP) Certificate

الهيئة العامة للطيران المدنيتعميم
النصّ بالإنجليزية كما وردلم ينشر المصدر نصًّا لهذا التعميم
الجهة
الهيئة العامة للطيران المدني
النوع
تعميم
الصلاحية
غير مبيّن
لم يعلن المصدر حالة هذا التعميم.

نصّ الخطاب (مستخرَجٌ آليًّا من الملفّ)

قد يحتمل أخطاء القراءة الآلية — المرجع الملفّ الأصلي ↗.

ADVISORY CIRCULAR

SUBJECT
APPLICATION FOR IFP FLIGHT VALIDATION SERVICE PROVIDER
(FVSP) CERTIFICATE

DATE 15 May 2026

AC NUMBER AC 172.03

VERSION 2.0

NOTE: THIS ADVISORY CIRCULAR IS PUBLISHED TO PROVIDE REGULATORY INFORMATION AND DESCRIBE ACCEPTABLE MEANS OF COMPLIANCE WITH
THE GENERAL AUTHORITY OF CIVIL AVIATION REGULATIONS (GACAR).

CHAPTER 1 – BACKGROUND
1.1 Purpose
This Advisory Circular (AC) provides guidance to applicants seeking certification as an Instrument Flight Procedure (IFP) Flight Validation Service Provider (FVSP) under GACAR Part 172.
Applicants must provide sufficient information to enable the GACA President to properly assess the application.
This AC describes the information normally expected in support of an application.
1.2 Applicability

This AC applies to all IFP Flight Validation Service Providers (FVSP) required to obtain and maintain certification under GACAR Part 170 and GACAR Part 172. 1.3 Cancellation This AC cancels and supersedes AC 172.03, Version 1.0, dated 01 September 2016. This AC remains in effect until cancelled, suspended, or amended by the GACA President. 1.4 Related Regulatory Provisions This AC must be read in conjunction with the following:
- GACAR Parts 1, 4, 5, 97, 170, 172, and 199. - eBook Volume 8 - Air Navigation Services - Certification & Administration 1.5 Related Reading Material (a) Advisory Circular AC172-01; (b) ICAO Annexes 2, 4, 10, 11 and 15;

AC 172.03

Page 1 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version

Version 2.0

(c) ICAO PANS-OPS Procedures for Air Navigation Services — Aircraft Operations (Doc 8168): (1) Volume I – Flight Procedures; and (2) Volume II – Construction of Visual and Instrument Flight Procedures
(d) ICAO Required Navigation Performance Authorization Required (RNP AR) Procedure Design Manual (Doc 9905)
(e) ICAO Quality Assurance Manual for Flight Procedure Design (Doc 9906): (1) Volume 1 – Flight Procedure Design Quality Assurance System; (2) Volume 2 – Flight Procedure Designer Training (Development of a Flight Procedure Designer Training Programme) (3) Volume 3 – Flight Procedure Design Software Validation; (4) Volume 5 – Validation of Instrument Flight Procedures; and (5) Volume 6 – Flight Validation Pilot Training and Evaluation;
(f) ICAO Instrument Flight Procedures Construction Manual (Doc 9368); (g) ICAO Continuous Descent Operations (CDO) Manual (Doc 9931); (h) ICAO Continuous Climb Operations (CCO) Manual (Doc 9993); (i) ICAO Performance-based Navigation (PBN) Manual (Doc 9613); (j) ICAO Manual on the Development of a Regulatory Framework for Instrument Flight
Procedure Design Service (Doc 10068); (k) Manual on Simultaneous Operations on Parallel or Near-Parallel Instrument Runways
(SOIR) (Doc 9643); (l) ICAO Manual on All Weather Operations (Doc 9365) 1.6 Definition of terms used in this AC This AC does not introduce any new definitions. 1.7 Approval This AC has been approved for publication by the Executive Vice President of Aviation Safety and Environmental Sustainability Sector of the GACA.

AC 172.03

Page 2 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version

Version 2.0

CHAPTER 2 - APPROVAL AS IFP FLIGHT VALIDATION SERVICE PROVIDER (FVSP)
2.1. Compliance with Regulations
2.1.1 The applicant must demonstrate compliance with all applicable requirements of GACAR Part 170 and GACAR Part 172 relevant to IFP flight validation activities.
2.1.2 The application must include a compliance statement describing how the applicant meets those requirements.
2.2 Information to be Supplied
The application must include, as a minimum:
- Applicant’s legal name and principal place of business; - Corporate and organisational structure, including executive/senior management
personnel; - Description of the proposed scope of IFP flight validation activities; - Summary of relevant IFP flight validation experience; - Details of aircraft proposed for flight validation, including installed validation
equipment; - Details of flight validation personnel/crew qualifications and training; - Description of the IFP flight validation methodology and quality assurance process; - Sample IFP Flight Validation Report and relevant procedures.
Note: Refer to the Air Navigation Service Certificate application form and the latest version of e-Book Volume 8 available on the GACA website (www.gaca.gov.sa).
2.3 Economic license
Reference must be made to the latest applicable Air Navigation Services Economic Regulation available on the GACA website.
2.4 Flight Validation Manual (FVM)
2.4.1 A complete Flight Validation Manual (FVM) must be submitted to the GACA President for acceptance.
2.4.2 The FVM must comply with the applicable requirements of GACAR Part 172 and must describe the organisational, operational, and technical procedures governing IFP flight validation activities.
2.5 Type of flight procedure to validate
2.5.1 The application must state the types of flight procedures that the applicant proposes to validate.
2.5.2 The applicant must provide evidence of adequate flight validation experience and technical capability for each proposed procedure type.

AC 172.03

Page 3 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version

Version 2.0

2.6 Verification

The FVM must include documented standard operating procedures, including checklists, forms, data recording, record-keeping and quality assurance processes sufficient to ensure traceability and verification of flight validation activities.

2.7 Organisation

2.7.1 The FVM must describe the organisational structure of the flight validation organisation.

2.7.2 The duties and responsibilities of each relevant position involved in IFP flight validation operations must be defined.

2.8 Crew Requirements

2.8.1 IFP flight validation pilots must meet the qualification, training, and experience requirements specified in GACAR Part 172, Appendix B.

2.8.2 Where rotorcraft are used for flight validation, the additional requirements specified in Appendix B (d) of GACAR Part 172, must be met.

2.9 Flight Validation Aircraft

2.9.1 Flight validation aircraft must be suitable for the intended validation activities.

2.9.2 Suitability must consider aircraft performance, installed validation equipment, and operational capability consistent with the proposed scope of validation.

2.10 Safety Management System

2.10.1 The applicant must establish and maintain a Safety Management System (SMS) as an integral part of IFP flight validation operations.

2.10.2 The SMS must be consistent with applicable GACAR requirements. Guidance is provided in Advisory Circular AC005-01 – Safety Management Systems.

2.11 Approval

2.11.1 If the application is approved, the GACA President will notify the applicant in writing.

2.11.2 The certificate:

- must not be transferable; - remains valid unless it expires or is withdrawn by the GACA President; - must be renewed by submitting an application to the GACA President at least 90
working days before the expiry date.

2.12 Rejection of Application

2.12.1 If an application is not approved, the GACA President will notify the applicant in writing and identify the deficiencies. 2.12.2 The applicant may submit a new or revised application once additional evidence has been provided to address the deficiencies identified in the original application.

Page 4

AC 172.03 UNCONTROLLED DOCUMENT WHEN DOWNLOADED

Version 2.0

Consult the GACA website for current version