AC 139-05 Airport Collaborative Decision-Making (A-CDM)
- الجهة
- الهيئة العامة للطيران المدني
- النوع
- تعميم
- الصلاحية
- غير مبيّن
نصّ الخطاب (مستخرَجٌ آليًّا من الملفّ)
Public - عام
ADVISORY CIRCULAR
SUBJECT:
Airport Collaborative Decision-Making (A-CDM)
DATE:
22 July 2026
AC NUMBER:
AC 139-05
VERSION:
1.0
NOTE: THIS ADVISORY CIRCULAR IS PUBLISHED TO PROVIDE INFORMATION ABOUT AIRPORT COLLABORATIVE DECISION-MAKING
1.1 Purpose.
CHAPTER 1 – INTRODUCTION
This Advisory Circular (AC) provides guidance on Airport Collaborative Decision-Making (ACDM) and its application to aerodrome operations. A-CDM is a structured way for aerodrome operators, air navigation service providers, aircraft operators, ground handlers, apron managers, and other relevant parties to share operational information and make coordinated decisions in real time.
The objective is to improve the efficiency, predictability, resilience, and safety of aerodrome operations during normal, disrupted, and recovery conditions. The concept supports better management of turn-round activities, stand use, departure sequencing, and operational recovery by creating a common operational picture for all participating parties.
1.2 Applicability
This AC applies to aerodrome operators and to all relevant A-CDM stakeholders operating at or serving an aerodrome, including aircraft operators, ANSPs, ground handling agents, and apron management services.
1.3 Cancellation
This is the first official version of this AC, and it cancels no other AC. However, any amendment to this version would be announced as a replacement for this AC.
AC 139-05
Public - عام
Page 1 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version
Version 1.0
Public - عام
1.4 Related Regulatory Provisions
• Saudi National Air Navigation Plan (SNAP); • GACAR Part 139 – Certification, Authorization and Operation of Aerodromes; • GACAR Part 170 – Certification: Air Navigation Service Providers; • GACAR Part 151 – Ground Service Providers. • GACAR Part 1 – Definitions, Abbreviations and Editorial Conventions; • GACAR Part 171 – Air Traffic Services; • GACAR Part 5 – Safety Management Systems.
1.5 Related Reading Material
• ICAO Doc 9971 – Manual on Collaborative Air Traffic Flow Management (ATFM); • ICAO Annex 14 – Volume I — Aerodrome Design and Operations; • ICAO Doc 9981 – Procedures for Air Navigation Services - Aerodromes; • ICAO Global Air Navigation Plan (GANP) (Doc 9750); • ICAO Doc 4444 – Air Traffic Management (PANS-ATM).
1.6 Definitions of Terms Used in this AC
• Airport Collaborative Decision Making (A-CDM) is a set of processes that enables aerodrome stakeholders to share operational information instantly and collaborate effectively, with the aim of enhancing efficiency and improving the predictability of air traffic operations.
• System Wide Information Management (SWIM) is a new way for managing and exchanging information. It replaces the current ground-ground point-to-point information exchange with an aviation intranet relying on internet technologies, enabling information services to be provided to the ATM community. To facilitate publish/subscribe and request/reply to based information exchange through standardised information services, provisions for the information service content and service overview are defined and appropriate SWIM governance established.
AC 139-05
Public - عام
Page 2 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version
Version 1.0
Public - عام
• Air Traffic Flow Management (ATFM) is a service established to contribute to a safe, orderly and expeditious flow of air traffic by ensuring that ATC capacity is utilised to the maximum extent possible and that the traffic volume is compatible with the capacities declared by the appropriate ATS authority.
1.7 Approval This AC has been approved for publication by the Executive Vice President, Aviation Safety and Environment Sustainability Sector, General Authority of Civil Aviation.
AC 139-05
Public - عام
Page 3 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version
Version 1.0
Public - عام
CHAPTER 2 – AIRPORT CDM
2.1 DESCRIPTION AND PURPOSE OF A-CDM
A. A-CDM is the aerodrome application of the wider collaborative decision-making philosophy used in aviation. It creates a shared, real-time operational environment in which aerodrome stakeholders work from the same milestones, target times, constraints, and priorities. The result is better situational awareness and more coordinated action across the aerodrome system. B. A-CDM is not only a technology project. It is primarily an operational and governance framework supported by procedures, agreed data quality standards, and information-sharing tools. It relies on accurate data, local business rules, clear accountability, and a commitment by all partners to act on shared information. C. At its core, A-CDM improves how airports manage turn-round, stand allocation, taxi and runway demand, and departures. In more mature implementations, it also links local airport planning with the ATM network, airport operations plans, airport operations centres, and wider total airport management concepts.
2.2 MAIN BENEFITS OF A-CDM
A. Operational benefits: improved predictability, shorter and more stable turn-round times, better use of stands and airside resources, and more efficient pre-departure sequencing. B. Financial benefits: fewer avoidable delays, better asset use, lower disruption costs, and the possibility of delaying or reducing unnecessary infrastructure expansion. C. Safety and resilience benefits: improved coordination, earlier identification of operational risks, and stronger recovery capability during adverse weather, emergencies, and irregular operations. D. Environmental benefits: less engine running time on the ground, more efficient stand and taxi usage, and better demand-capacity balancing.
2.3 A-CDM MAJOR OPERATIONAL AREAS
A. Pre-departure sequencing: coordinating flight readiness, target off-block times, and departure
AC 139-05
Public - عام
Page 4 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version
Version 1.0
Public - عام
flow. B. Stand management: allocating and managing stands to reduce conflicts and improve aircraft turn-round performance. C. Resource management: coordinating ground handling, fuelling, de-icing where applicable, and other support services. D. Slot and capacity management: integrating local operational plans with ATFM constraints and airport capacity declarations.
2.4 OPERATIONAL IMPROVEMENT STEPS AND TECHNICAL ENABLERS
The implementation of Airport Collaborative Decision-Making (A-CDM) should be approached as a progressive operational transformation rather than solely as the deployment of a new information technology system. Its effectiveness depends on the coordinated improvement of airport processes, the establishment of common operating procedures, the definition and exchange of reliable target times, and the active participation of all relevant stakeholders. The delivery of these operational improvements requires appropriate technical and operational enablers.
2.4.1 Operational Improvement Steps (OIS)
The Operational Improvement Steps address key areas of airport performance, including a) Improved operations during adverse conditions; b) Improved turn-round processes; c) Collaborative pre-departure sequencing; d) Basic departure management (pre-departure management); e) Collaborative airport planning interface (AOP fully integrated with Network Operations Plan & local business rules); f) Integration of landside (passenger and baggage) process outputs; g) Consolidation and facilitation of target times between ATFM, A-CDM and extended arrival management;
2.4.2 Technical & Operational Enablers
AC 139-05
Public - عام
Page 5 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version
Version 1.0
Public - عام
Technical solutions should support, rather than replace, effective operational coordination. Accordingly, their design and implementation should be based on agreed operational requirements, clearly defined stakeholder responsibilities, harmonised data standards, system interoperability, information security, business continuity and measurable performance objectives. The selection of each enabler should therefore be proportionate to the airport’s operational needs and form part of a scalable implementation roadmap that enables future development and integration with national and regional ATM systems.
Technical & Operational Enablers, include the following: a) A simple A-CDM dialogue system to a more advanced A-CDM information sharing platform; b) Interconnection of A-CDM and the network using data exchange models; c) Development of an Airport Operations Plan module; d) Implementation of a system for information sharing between the APOC participants; e) Implementation of real-time monitoring and decision support systems within an operational facility able to accommodate representation from all stakeholders; f) Designation and equipage of a physical infrastructure as an APOC; g) Mobile Applications: Apps that allow personnel on the ground to access real-time data, communicate with other teams, and report issues instantly; h) Landside management systems, including passenger management; i) Communication networks.
2.5 ICAO ALIGNMENT AND MATURITY PATH
The ICAO Global Air Navigation Plan addresses A-CDM through the aviation system block upgrade framework. This allows aerodromes and ANSPs to implement A-CDM progressively according to local operational needs and technical maturity. The maturity path begins with local airport information sharing, progresses to integration with the ATM network, and then expands toward AOP, APOC, Total Airport Management (TAM), advanced TAM supported by AI/ML, integration of new entrants, and finally full synchronisation with trajectory-based operations.
AC 139-05
Public - عام
Page 6 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version
Version 1.0
Public - عام
2.6 ICAO A-CDM ELEMENTS
Element ID ACDM-B0/1 ACDM-B0/2 ACDM-B2/1 ACDM-B2/2 ACDM-B2/3 ACDM-B3/2 ACDM-B3/3 ACDM-B3/4 ACDM-B4/1
Title Airport CDM Information Sharing (ACIS) Integration with ATM Network function Airport Operations Plan (AOP) Airport Operations Centre (APOC) Total Airport Management (TAM) Advanced total airport management (TAM) Extension of Advanced TAM to integrate AI/ML Extension of Advanced TAM to integrate new entrants Full integration of A-CDM and TAM in TBO
Table 1: ICAO A-CDM ELEMENTS
AC 139-05
Public - عام
Page 7 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version
Version 1.0
Public - عام
CHAPTER 3 – A-CDM STAKEHOLDERS
3.1 GENERAL PRINCIPLES
A. A-CDM is a collaborative operational process. The participating organisations and their level of involvement may differ from one aerodrome to another, but at a minimum, the aerodrome operator, aircraft operators, and the ANSP should be part of the process. Other organizations participate according to local operational arrangements, infrastructure, service models, and risk exposure.
B. A-CDM is scalable. Each aerodrome should adopt a local model that reflects who owns the data, who controls the relevant assets, and who has decision authority for the milestones being managed. Roles should be defined clearly, documented formally, and reviewed as the program matures.
3.2 GOVERNANCE AND ACCOUNTABILITY
A. Before implementation, the participating organisations should agree on the operational rules, the information to be shared, the expected quality of the data, the target times and milestones to be used, and the actions to be taken when milestones are at risk. The consequences of noncompliance should also be understood in advance.
B. These arrangements should normally be formalised through a memorandum of understanding (MoU), letter of agreement (LoA), or equivalent governance document. The governance framework should support collaboration, transparency, and a culture of no blame, focusing on operati