ADVISORY CIRCULAR

SUBJECT: ALTERATIONS AND REPAIRS

DATE: 2016-06-15

AC NUMBER: 021-07

VERSION: 1.0

TABLE OF CONTENTS

Chapter 1 - Introduction ...................................................................................... 2 Chapter 2 - GACA Supplemental Type Certification Procedures .............................. 4 Chapter 3 - Performance and Recording of Alterations and Repairs ...........................27 Chapter 4 - GACA Repair Design Approval Procedures ......................................... 31

Chapter 5 - Foreign Design Approvals Using a Saudi Arabian Registered Aircraft as the

Prototype Chapter 6 - Continued Airworthiness Chapter 7 - For Further Information

................................................................... 38 ....................................................................... 39

AC 021-07

Page 1 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version

VERSION 1.0

ADVISORY CIRCULAR

SUBJECT: ALTERATIONS AND REPAIRS

DATE: 2016-06-15

AC NUMBER: 021-07

VERSION: 1.0

NOTE: THIS ADVISORY CIRCULAR IS PUBLISHED TO PROVIDE REGULATORY INFORMATION AND DESCRIBE ACCEPTABLE MEANS OF COMPLIANCE WITH THE
GENERAL AUTHORITY OF CIVIL AVIATION REGULATIONS (GACAR).

CHAPTER 1 – INTRODUCTION
1.1 Purpose. The purpose of this advisory circular (AC) is to provide information on the procedures and general practices when carrying out alterations and repairs on Saudi Arabian registered aircraft. This advisory circular represents an acceptable means of compliance with the applicable requirements prescribed in GACAR Part 21 Subpart C for changes to type certificates that use Saudi Arabian registered aircraft as the prototype and Subpart D for obtaining a GACA supplemental type certificate (STC) or a GACA repair design approval (RDA) and for properly executing the approval for return to service after incorporating an STC or RDA. This advisory circular also provides guidance for owners/operators of Saudi Arabian registered aircraft which are used as the prototype for STCs issued by the Federal Aviation Administration (FAA) or other foreign civil aviation authorities.
1.2 Applicability. This advisory circular is applicable to aircraft owners, operators, repair stations and aircraft maintenance personnel for aircraft on the Saudi National Aircraft Register.
1.3 Cancellation. This is the first official version of this advisory circular and it cancels no other advisory circulars. This AC is the replacement of GACA Airworthiness Guide No. 7 (AG-7).
1.4 Related Regulatory Provisions. GACAR Parts 1, 11, 21, 43, 91, 121, 125, 135 and 183 and the Implementing Regulations of the Civil Aviation Tariff Act.
1.5 Related Reading Material.

AC 021-07

Page 2 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version

VERSION 1.0

(a) GACA AC 000-02 Applicability and Use of FAA Advisory Circulars. (b) GACA AC 000-05 Payment of Fees and Charges. (c) GACA AC 011-01 Petitioning for Exemption. (d) GACA AC 021-003 Types of Approved Data for Alterations and Repairs on Saudi Arabian Registered Aircraft. (e) FAA AC 21-40 () Application Guide for Obtaining a Supplemental Type Certificate. (f) FAA Order 8110.4() Type Certification. (g) FAA Order 4040.26(), Aircraft Certification Service Flight Test Risk Management Program. (h) Working Arrangement between EASA & GACA.
1.6 Definitions of Terms Used in this Advisory Circular. Affected parties should refer to Subpart A of GACAR Part 1 for a full listing of defined terms used in the GACAR. In addition to the defined terms in GACAR Part 1, this advisory circular introduces the following additional term:
Organization means an air carrier, air operator or repair station certificated and operating under the GACAR or any aircraft owner/operator who has engineering resources or can obtain engineering services under contract.
1.7 Approval. This advisory circular has been approved for publication by the Assistant President, Safety, Security and Air Transport Sector of the General Authority of Civil Aviation.

AC 021-07

Page 3 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version

VERSION 1.0

CHAPTER 2 – GACA SUPPLEMENTAL TYPE CERTIFICATION PROCEDURES
2.1 General. (a) The GACA STC is used by GACA to signify an approval of a major change in type design (i.e. an installation data approval of a major alteration on a KSA registered aircraft). The GACA STC process is based on the FAA STC process. Accordingly, FAA AC 21-40( ) should be read in conjunction with the procedures provided in this chapter. In case of conflict between the two, the procedures in this chapter are to prevail.
(b) Major changes in type design may be GACA approved only after the applicant has shown, and the GACA has found, that the changed product complies with the applicable airworthiness requirements of paragraphs (a) and (b) of GACAR § 21.67 and the aircraft has no feature or characteristic that makes it unsafe for the category in which certification is requested.
(c) A GACA STC will not be issued to:
(1) Approve alterations to TSO approved articles unless the TSO is invalidated for the altered article. A GACA STC which alters a TSO article must provide for installation; or
(2) Combine two or more GACA STCs or other foreign approvals accepted by the GACA without additional showing of compliance.
(d) In general, the process for GACA STCs follows the process described in FAA AC 21-40( ) and FAAO 8110.4( ), except as identified in this AC. The following sections describe a generic four phase certification process for a GACA STC project. The sequencing of these phases and their associated steps and activities as described in this AC is representative of the ideal sequence of events but it is understood that many of these steps and activities will overlap or may follow a different chronological order.
(e) It is essential to understand that the GACA STC process described herein is flexible in the sense that some of the procedures may be simplified or omitted on a case-by-case basis, as determined by the GACA. The GACA will advise the applicant of all the applicable procedural steps or simplification thereof at the time the project is accepted. The degree of customization of the GACA STC procedures will be a function of the project scope (number of alteration packages and number of aircraft affected) and of the nature (complexity and criticality) of the alterations. This merely means that the rigor in finding compliance may vary; however, the minimum level of safety of any alteration remains the same. Notwithstanding the inherent flexibility permitted by the GACA STC process, some of the steps are required and/or cannot be substantially simplified regardless of the project. These steps include: letter of application, GACA acceptance of the project, fee payment, applicant showing conformity and

AC 021-07

Page 4 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version

VERSION 1.0

compliance, certification data, STC issuance and project closure.
(f) Applicants are strongly encouraged to obtain the services of GACA designees for certification services for GACA STC projects. The appointment and certification activities of GACA designees must be in accordance with the regulatory requirements of GACAR Part 183 – Representatives of The President and the policies and procedures of GACA eBook Volume 14 Designees – Appointment & Management.
(g) Alternatively, aircraft owners may seek GACA STCs through the use of EASA Design Organizations in accordance with the provisions of the GACA/EASA working arrangement.
(h) An air carrier operating under GACAR Part 121 is to follow the same steps and activities described in this chapter.
(i) The GACA may use the technical assistance from other CAAs. Such technical assistance could be with respect to conformity inspections, test witnessing, finding of compliance, etc. and will be documented in the GACA project file.
(j) The application for an STC may be subject to a sequencing process due to work load which may impact the initiation of the project.
2.2 Phase 1 – Project Initiation. Phase 1 of the certification process involves all activities commencing with notification by the applicant that they intend to seek certification of a major alteration through the formal acceptance of the certification plan by the GACA and the issuance of a GACA project authorization number.
2.2.1 Letter of Intent. (a) Applications for a GACA STC should normally be initiated by an Organization in the form of a letter of intent sent to the GACA. The letter of intent should be of sufficient detail to allow the GACA to determine GACA resource requirements necessary to support the GACA STC process and to assess whether nominated persons (i.e. already appointed GACA-DERs, GACA-DARs, FAA DERs or other foreign delegated individuals) would have sufficient scope of delegation to address the required compliance aspects of the project. A letter of intent is not a mandatory step in the process. However, it is an excellent means to ensure that the Organization does not expend resources to produce the documents required with the letter of application for a project that the GACA might decline thereafter.
(b) A letter of intent must shows project information including:
(1) Identification of aircraft make, model, serial number(s) and registration mark(s);

AC 021-07

Page 5 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version

VERSION 1.0

(2) Description of the alteration(s) - highlight novel and unusual design features;
(3) Location of the aircraft and the certification activities;
(4) Use of existing approvals as a basis for the GACA STC (e.g., FAA STC), if applicable;
Information Note 2.1: An installation data approval (e.g., FAA STC) that an Organization would wish to use with a deviation that would constitute a major change in itself would need further approval. However, the Organization would only need to obtain additional findings of compliance for those requirements that are affected by the deviation. A GACA STC would still be required as the installation data approval but such an approach would be more efficient (than a full GACA STC project, for example) from both the Organization’s and GACA's point of view.
(5) Project schedule including major milestones , and
(6) As required, the names and expected roles of each already appointed GACA-DERs and GACA-DARs, or FAA DERs and other foreign delegated individuals and organizations, to be authorized for the project if known, or the identification of areas of specialties (e.g., avionics, conformity inspections) to be covered by GACA-DERs, GACA-DARs, FAA DERs and other foreign delegated individuals yet to be nominated and/or authorized.
(c) The owner/operator of the aircraft is to be copied on the letter of intent.
2.2.2 GACA response to the Letter of Intent. The GACA will respond to the letter of intent by advising whether the project described therein can be supported or not. This response by GACA does not signify formal acceptance of the project but rather indicates that the Organization is invited to submit a formal letter of application along with the applicable fee.
2.2.3 Letter of Application. (a) The letter of application is a mandatory step in the GACA STC process and it must contain the following:
(1) A request for project authorization number.
(2) Copy of Preliminary Certification plan including basis of certification for each alteration package.
(3) Copy of Preliminary Compliance Checklist.
(4) The nomination of individuals and/or authorization request for the use of specific

AC 021-07

Page 6 UNCONTROLLED DOCUMENT WHEN DOWNLOADED
Consult the GACA website for current version

VERSION 1.0

GACA-DERs, GACA-DARs, FAA DERs and other foreign delegated individuals or organizations, if applicable.
(5) Supporting documents of existing approvals to be used.
Information Note 2.2: After the letter of